Lat: 38.45775 (N 38°27.465') (N 38°27'27.9") (WGS 84 datum) Lon:-121.84230 (W121°50.538') (W121°50'32.3")(V: Determined by GPS site visit.)
Status:
9/09: 1220V GFCI repaired.
5/09: Install complete. Caution 32A max on Tesla HPC.
120V GFCI not working.
.
4/30/09: Avcon removed; Tesla ACE 70A being installed. Part of PG&E upgrade project. Installation incomplete.
8/29/08 Both chargers have been replaced.
Both chargers have been vandalized., apparently ion late March, 2008. See I Was There comments.
Comments:
9/09: repaired 120V GFCI
9/7/03: Visited site. Power on, chargers working.
8/27/03: Old news: Was new install. Incomplete, waiting meter set from PG&E
Driving directions:
From I-80, exit Pitt School Road, turn right onto Pitt School Road, first right onto Ary Lane. Look for Taco Bell on the right, and take the first right after Taco Bell into the Pitt School Plaza parking lot.
Go to Google Local for driving directions to/and from any location, and to find points of interest.
How to find the charging station location once you have found the site:
At right rear corner of Pitt School Plaza parking lot -- the last two spots up against the freeway fence, in front of the transformer.
Nearby charging locations:
Use the EVChargerMaps system to find nearby charging sites, and to leave comments about this site.
Things to do:
In the immediate vicinity:
Baskin Robins Ice Cream
Chevy's Fresh Mex, Microtel Inn, Baskin Robbins, Mary's Pizza Shack, Pizza Hut, Subway, li Xu's Chinese Food, International House of Pacakes (IHOP), Arby's, Taco
Bell, McDonalds,. Java California, Quizno's.
A little further down the road, on Stratford Ave.:
Burger King, Best Western Inn, Capital China Restaurant, Wells Fargo Bank, Denny's.
Rating:
4 Raters:
Tom Dowling, Ed Huestis 4/04
Equipment model and serial number info:
TAL: S0301066; ICS200B: TR0901012
Meter readings::
9/23/03: 0.0 kwh
1/10/04: 255 kwh
6/8/04: 407 kWh (AVC 0.0)
by Darell Dickey, assisted by Kyra Dickey
by Darell Dickey, assisted by Kyra Dickey
Generated on Sunday, 1/30/2011, at 10:47:01 PM PT from evcnall.fp7.
Revision History:
9/09: Changed to OK.
4/30/09: Changed from OK to OC PROB.
8/28/08: Changed from DOWN LOC to OK.
7/12/2007: Added "I Was There" report.
12/28/2006: Added "I Was There" report.
9/15/2006: Added "I Was There" report.
3/24/2006: Added "I Was There" report.
2/21/2005: Added "I Was There" report.
11/17/2004: Added "I Was There" report.
5/16/2004: Added "I Was There" report.
5/3/2004: Added "I Was There" report.
5/1/2004: Added "I Was There" report.
1/27/04: Addded Baskin Robbins to to-do list.
11/7/03: Added serial numbers, per SMUD list.
10/29/03: Added new map, minor lat/lon correction.
9/24/03: Added voltage reading.
9/21/03: Added photos, updated driving directions and location on site.
9/7/03: Revised comments.
8/27/03: Added site.
6/8/2003 new site per Ed Huestis.
Do you see any discrepancies or have any information for us about this page?
Please add comments, using the EVChargerMaps system. Click here.